INTENTION
From our discussion, our team has select ‘Just Do It’ as our motto for our group. We choose this slogan as our group intention because we believe that we can do anything that we think we want as long it is not illegal. From this domes project, people may think that it is hard to accomplish it, but our group does not care about what other people think and we just do it. From our opinion, we think that we can do anything right if we work together as a team. As a result, now our project is already near completed and our intention that is ‘Just Do It’ is really suitable for our group. And from this dome project, we have learned how to build the dome. Besides that, they are many type of dome that can be build that is 1V, 2V, 3V and many others.
ACTOR
Our group members are from five different major which are architecture, planning, quantity surveying, construction management, and interior design. All of us have played our role in completing the project. The roles are as below : -
1) Architect : designing and furnishing the dome.
2) Planner : plan the strategy on how to build up the dome.
3) Quantity surveyor : calculating all the measurement of the materials in producing the dome.
4) Construction manager : ensure the progressions of the project are in the right path and smooth.
5) Interior designer : co-operate with architect in designing and furnishing the dome.
ACT
First, we were discussing about the dome that we were going to produce and then deciding about the material that will be used. We also were looking for the identity of our team. From the discussion we have concluded that we were going to produce is 1V dome with radius 3 feet or 0.92m and 2.27m height. The material that we used is trouncing pipe
and had been sponsored by one of our group member’s family.
PRODUCT
We were producing 1V geodesic dome which is the simplest dome out of all. Geodesic means a straight line on a plane or an arc of a great circle on a sphere. The measurement of the dome are as listed below : -
Radius : 0.92m
Height : 2.27m
To build the dome we have used different size of trouncing pipes. We have eight pieces pipes length 1.83m each, 4 pieces pipes length 1.63m and some more. We also use some connectors to join the pipes. The shape of our dome is square at the base and pyramid shape at the above. It can accommodate more than five people and it is light so we can carry it.
SITE
The site that has been fixed for us is situated at HBP Minden Valley.
Our lot is lot number 34 which quit far to the HBP studio.
RULES
- Team members at least one from different major.
- Lifespan not more than 12 months
- Link : no need to link with other domes I.e. Independent
- Zero cost
- Packaged
- recyclable
- Prefabricated
- Accommodate 5 person
- Carryable by 3 person
- Assemble in 30 minutes only by team members
- Show team identity
*Since this project is a groupwork, this report might similarly with my another group members
http://durafifa.blogspot.com/
Saturday, October 18, 2008
DOME'S REPORT